Tutorial on the whole process of making billboards

I、What is the tutorial for making LED light billboards?

1. Step 1: Prepare some materials and tools used in production. It includes a micro switch, several LED lights of various colors, several batteries, an iron frame for mounting the lamp, black cloth inlaid with the LED lights and some tools needed for work.

2. Step 2: First determine the pattern you want to draw, and then draw it on the black cloth.

3. Step 3: Stick the LEDs of various colors on the black cloth intact according to the outline of the drawn pattern.

4. Step 4: Connect each lamp with wires.

5. Step 5: After gluing the lamp, bind it to the pre pared wooden frame.

6. Step 6: Use a transparent plastic plate around the bound frame to seal it.

7. Step 7: After completing the above steps, wait for the glue to adhere the frame to dry and then install it in the corresponding position of the store.

II、Installation process flow of aluminum-plastic panel billboards_Aluminum-plastic panel billboard production tutorial

Installation process flow of aluminum-plastic panel billboards

Laying out → fixing Connecting parts of the skeleton → Fix the skeleton → Install the aluminum plate → Process the closing structure → Install advertising words → Inspection

1. Installation pre cautions

1. Type, quality, color, pattern of the aluminum plate The shape and lines should meet the design requirements, and there should be a product certificate.

2. If the frame of the advertising sign adopts light steel keel, its specifications and shape should meet the design requirements, and rust removal and anti-rust treatment should be carried out.

3. When installing aluminum plates, when the design does not require it, core-pulling aluminum rivets should be used, and rubber rings must be placed in the middle. The blind rivet spacing should be controlled within 100-150mm.

(1) Laying out the wires

Fix the skeleton and pop the position of the skeleton onto the base layer. The skeleton is fixed on the main structure, and the quality of the main structure is checked before laying out the wires.

(2) Connectors to fix the skeleton

Weld the connectors to the columns of the main structure to fix the skeleton.

(3) Fixed skeleton

The skeleton should be anti-corrosion treated in advance. The installation frame is in accurate position and the combination is firm. After installation, check the centerline, surface elevation, etc. In order to ensure the installation accuracy of the board, it is advisable to use theodolite to penetrate the beams and mullion members. Properly handle deformation joints, settlement joints, variable cross-sections, etc. to ensure that they meet usage requirements.

(4) Installation of aluminum plates

The installation and fixation of aluminum plates must be firm, reliable, and simple.

1. The gap between the boards should be processed internally to make it flat and smooth.

2. After the aluminum plate is installed, cover and protect the parts easily contaminated with plastic film or other materials.