How to install light box billboards on stainless steel

一、How to install outdoor advertising signs after they are designed?
How to install outdoor advertising signs after they are designed? Below, Menoxin briefly introduces the installation steps of outdoor advertising signs
1. Outdoor advertising signs In addition to paying attention to safety issues during the hoisting process, the installation of the signboard should also pay attention to the firmness of the welding and the anti-corrosion work at the joints; during the hoisting and lifting process, attention should be paid to adjusting whether the frame of the billboard is tilted, and continue to adjust until it reaches a safe position. , the whole process is directed by a dedicated person and equipped with a whistle to unify the operation.
2. Clear the installation sequence:
(1) Drilling: Fix the purchased formed iron letters to the appropriate position, use an electric drill to drill: 5MM or 8mm, the spacing is according to the external signboard system. It depends on the height and production cost. Generally, the center spacing of LEDs is: 10-30 mm. The smaller the spacing, the better the effect and the higher the cost.
(2) Insert lights: Clean the drilled holes and put the lights in one by one.
(3) Wiring: first connect in series and then in parallel to the power supply. This step is difficult. Don’t worry. There are reserved wires for each string. Generally, the red wire is connected to the positive pole of the power supply, and the black wire is connected to the LED. The negative terminal of the power supply.
(4) Test aging: After connecting all the LEDs, check and deal with those that do not light up, and then perform an aging test for 24 hours.
(5) Sealing: Fix the LED to the iron sheet.
(6) Test again and install.
3. The installation location of the installation vehicle should be selected based on the criteria of stable geological conditions and no harm to the greening; the lifting height should not be too high or too low, and should be appropriately adjusted according to the height of the lifting firmware and installation needs; use cable wind ropes to adjust The verticality of the column pre vents people from approaching for adjustment, which may cause safety hazards; the theodolite should verify that the verticality of the installation is less than 10mm.
4. Complete the installation of the light frame and other components according to the diagram.
5. Foundation review: Arrange relevant technical personnel to measure and review the foundation before installation. The inspection content includes: the foundation plane must be flat, without cracks, honeycombs, exposed ribs, etc.; the transverse centerline and longitudinal centerline of the foundation It must be vertical; the deviation of the basic outline size should not be greater than 20mm.